What Is a Temporary Power Pole?
A temporary power pole is a freestanding pole, usually wood, set at the edge of a job site to bring utility power in before the building has permanent service. Picture a basic temporary power pole diagram: pole, meter base, breaker panel and weatherproof outlets, all rated for construction loads. Most jobs in Auburn spec a 200 amp temporary power pole for construction sites to run saws, compressors, light tower rental units and a job trailer at once, and temporary power pole requirements for meter height and panel clearance come from the utility and the electrician, not from us. The pole gets set by a licensed electrician, then the utility connects it after inspection. We are not electricians, but we coordinate site access, staging and the ground conditions around the pole so installation goes smoothly alongside dumpsters, fencing and portable toilet rental already on site. If your crew is also renting a mobile office trailer rental unit, the pole location often gets planned around both trailer and equipment placement at the same time.

Where Should a Temporary Power Pole Go on Site?
Placement matters because the pole needs its own clearance and a straight run to the panel. Keep it away from delivery paths. A roll-off dumpster rental needs about 60 feet of straight clearance behind the truck, and that clearance zone should never overlap where the power pole sits or where cords run. Plan the pole near where GFCI-protected circuits under OSHA 1926.404(b)(1)(ii) will feed the busiest part of the site, usually near the trailer and tool staging. Keep walking paths clear too, since OSHA 1926.25 requires debris cleared from work areas, and a tripped cord across a walkway is the same hazard as scrap lumber. If your Auburn site also uses temporary fence rental or chain link temporary fence panels, plan the pole location before the fence line goes in, not after, so the electrician isn't cutting a gate into a fence that's already anchored.

What Does Temporary Power Pole Rental and Installation Cost?
Installation pricing depends on your electrician, the utility connection fee and pole rental duration, none of which we set or invoice. We are not the source for that number, so get a quote from your electrician directly. What we can tell you is how it fits into the rest of your site budget. Below is what comparable site equipment runs in Auburn so you can plan the whole setup, not just the pole.
| item | day | week | month |
|---|---|---|---|
| standard portable toilet | 100-350 | 130-500 | 125-325 |
| 10-20 yard dumpster | 51-112 | 426-778 | 91-500 |
| temporary fence panel | 30-75 | - | - |
| storage container | - | - | 100-250 |
See porta potty rental cost and dumpster rental cost for a fuller breakdown by unit size. A storage container rental cost page covers 20ft and 40ft options if you're staging tools near the power drop.
Auburn sites often run all of this together: pole, fencing, dumpster, toilets. Coordinating delivery windows for each saves you separate site visits, and it's worth checking dumpster permit requirements and porta potty permit requirements early, since neither is guaranteed and both need confirming with the city before delivery day. Sumner sits about 8.9 miles south of Auburn and Covington about 9.2 miles northeast, so if your project spans sites in either direction, we coordinate delivery across both without extra trips.
Frequently asked questions
Do I need a permit for a temporary power pole?
Permit rules for temporary power vary by jurisdiction and by utility provider, so we cannot state Auburn's specific requirement here. Confirm directly with the city building department and your utility before scheduling installation. The same caution applies to porta potty permit requirements for units placed in the right of way.
How many amps does a construction site need?
Most mid-size construction sites run 200 amp temporary service to cover tools, trailer power and lighting. Smaller sites sometimes use 100 amp service. Your electrician sizes this based on your actual equipment load, not a fixed rule.
How long does temporary power pole installation take?
Installation itself is usually a half day once the electrician and utility schedule align. The utility connection step can take longer depending on inspection queues, which is outside our control and worth asking about early.
Can Auburn Porta Pros install the power pole?
No. We handle sanitation, dumpsters, fencing and storage logistics around your site, not electrical work. We coordinate placement and access so your licensed electrician's pole installation doesn't conflict with other equipment on site.
What else should I plan alongside the power pole?
Most Auburn job sites pair the power pole with a dumpster, fencing and toilets set up at the same time. See how many porta potties do I need and construction dumpster rental to plan the rest of your site setup in one pass.